Project Description

Investment Opportunity in ranchland in Paraguay - South America
Investment project for converting virgin forest to fattening ranch
Extensive system of fattening cattle on pasture implanted

The projected cattle establishment comprises a surface area of 9,600 acres., The grass species to implant is the Gatton panic, due to its adaptation to the soil and climate of the region.

Taking into account the surface and the forage supply estimated is recommended that the livestock activity is the wintering the business is buying male calves and steers selling for fridges.

The age of calves is an average of 7 months with an average weight of 250 kg and the sale of steers at an age of 22-25 months average weight of 460 kg.
Fattening cycle is estimated at 18 months, sales starting with at 15 months and ending at 18 months.



LAND CLEARING

The clearing authorized by SEAM (Ministry of Environment) and INFONA (Instito National Forest)
is the snail type, we will use laminated type land  clearing, then dredge technique Aradora and machinery leveling with despalitada to prepare 200 hectares of land to produce hay. Estimated production of hay: 4,000 bales of 400 kg., To be used in times of fodder shortage.





The disassemble was approved by the authorized entity
is going to meet environmental standards lar
    establishing biological corridors
    forest reserves
    forest reserves for paleocauses
    forest strips is left between pastures































































































PASTURE
The estimated burden that will withstand the pasture is 300 Kg / Ha. A full charge 4,000 cattle

WATER
The estimated  water consumption of 60 liters. per head. With 4,000 head, the daily water need be 240,000 liters.

WELLS ARTESIAN
Because the farm is located on the aquifer Yrenda recommended drilling two artesian wells 180-220 feet deep, more than 200 meters apart to prevent theft of flow between wells. With two wells would have a rate of 27,000 liters. time, enough to cover water demand 4,000 head.

GENERATOR SET AND ELECTROPUMPS
It will be necessary to have a generator set to provide electrical energy the two electropumps and housing.
With two electric pumps are estimated volumetric pumping of 27,000 liters / hour. With 9 pm. cover pumping daily demand of 240,000 liters.

WIRED
Will be required approximately 135 km. Wiring for the division of the 4,000 hectares of pasture paddocks of 50 ha This amount will vary according to apotreramiento and alleys.

STOCKYARDS
Each paddock will have a yard for the management of the estate, each corral will have a sprue.

CORRALS
They built two corrals, one for each module of 2,000 hectares
The main module is designated as Central and secondary module as Retiro.

HOUSING
For Central is recommended building six semi-detached houses for foreman, female chef, two pawns, tractor driver, charged with maintaining water supply.
A house with an office for the manager
A  home  for the owners.
A  shed  for machinery.
Retirement  two semi-detached houses for the retreat charge and a pawn.
It is essential to water harvesting and storage cisterns.

BOULDERS AND MACHINERY
Pickup truck 4 x 4 for use of the General Manager
Cuaciclón  4 x 4 for inspection sprue, reservoirs and pipes. It will be used by the maintenance man water supply.
Tractor 4 x 4 of 110 HP, to construction of internal roads (approx. 80 km.)  Preparation of 200 hectares of land Bale.
Desalijo building material for wiring, corralones and corrals.
Implements several indispensable for the tractor perform detailed above.
Once we list the plot of bales will require the purchase of implements for producing bales (mower, rake and baler rake)

OPERATING COST
In the same details the estimated cost once the farm is completely developed and full load (4,000 cattle)
For monthly operating costs were prorated veterinary costs and estimated an average fuel consumption.
To get to the annual operating cost multiplied 12monthly costs and the Christmas bonus was added.
Sale of steers the exporting firm of meat
The estimated annual mortality of 3%.
A price of 3.05 U.S. $ / kg per hook. (Chilean market price) Weight 460 kg meat
Freight: to fridges of Asuncion.



ESTIMATION RESULTS
As estimated fattening time is 18 months, it took that period of time and not 12 months to provide an estimate of results.
The estimated Operating Income in 18 months, is US $ 585.000. Expected improvement in livestock prices, if you register the expected increase the Operating Income would have a significant improvement.


RECOMMENDATION

To be more confident in providing calf and get greater utility in the cattle business is recommended as a second step to form a breeding unit.


I have projects valued at U.S. $ 10 million. Includes the purchase of natural land and develop. Or purchase of ranchland all formed. Purchase of cattle. Operating capital. I seek investors with that amount of capital
the cattle business is very safe. Beef has high demand. Paraguay's ninth largest exporter of beef. In addition to operate the land and get good economic results. The price of land is seen in 10-30% annually in the Paraguayan Chaco. The time is now to buy land and develop. Because the laws are flexible still. I constituted corporations to foreign investors. Bearer share. 97% corresponds to the investor. I as administered 3%. Lands have been undervalued. It is important to buy large amount of land. In the medium term is going double its capital

The lands that I choose. Yrenda are on the aquifer, fresh water. Also there is oil in the Chaco. Choose the most productive land. In the area. cattle gains 220 kilograms in 18 months. Is a very safe and profitable on a large scale


It is a silvopastoral system. With forest reserve. Biological corridors are performed. Do not touch the paleocauces. Is shared pasture with trees. In the image is very impressive. But studies with biological corridors, ropagates more wildlife,this indicates that the Chaco forest is very dense. We work on balance, respect the reserves, watercourses, wildlife. The world needs food and Paraguay can not fall behind. With a good management plan and environmental impact assessment can be produced sustainably without harming nature

contact: luisaguilera@bancarios.com